MIME-Version: 1.0
Date: Tue, 25 Nov 2025 19:14:07 +0100
From: amza.njatono@matech-cameroun.com
To: Valeur Houell <valeur.houell@ihstowers.com>
Cc: Joseph Nkolo <joseph.nkolo@ihstowers.com>, Carlos El Khoury
 <carlos.elkhoury@ihstowers.com>, Vensa Mohamadu
 <vensa.mohamadu@ihstowers.com>, Alphonse Titchio
 <alphonse.titchio@ihstowers.com>, Stephane Ketchouang
 <stephane.ketchouang@ihstowers.com>, Armel Bikek
 <armel.bikek@ihstowers.com>, Bate Agbor <bate.agbor@ihstowers.com>, Eko
 Mvondo Andre Patrick <andre.eko@matech-cameroun.com>
Subject: Re: MS Mobile Generator availability
In-Reply-To: <PAWPR05MB1026219F48E915ABA75D3F7F8EFD0A@PAWPR05MB10262.eurprd05.prod.outlook.com>
References: <PAWPR05MB102623B90DBC58870222217B6EFD0A@PAWPR05MB10262.eurprd05.prod.outlook.com>
 <PAWPR05MB1026219F48E915ABA75D3F7F8EFD0A@PAWPR05MB10262.eurprd05.prod.outlook.com>
Message-ID: <8504ddc4caf3cafc024bb566dc3d1931@matech-cameroun.com>
X-Sender: amza.njatono@matech-cameroun.com
Content-Type: text/plain; charset=UTF-8;
 format=flowed
Content-Transfer-Encoding: 8bit

Dear Valeur

We started the project with 13kVA backup generators, which we still have 
in stock.

During the initial assessment, we found that the power requirements for 
the high loads at the sites range from 33 to 40 kVA.
Regarding the rental, no specific power rating was mentioned in 
contract, but a daily rental fee of 10,000 FCFA (ten thousand FCFA per 
day ) was charged (deploiment security and maintenance ).

This situation offers no way to purchase the medium power required for 
better results , we will make available the 13kVA belonging to us.

Regards

Amza NJATONO
MATECH SARL



Le 2025-11-24 18:10, Valeur Houell a écrit :
> Hi Amza,
> 
> One of the main RCA that impacted our operation performance in 2025 is
> generator failure and its contribution was emphasized by the fact that
> no mobile generator available to keep the site up while pushing for
> its replacement and identification of the RCA. To mitigate that impact
> aside the improvement of the PM quality and have a skilled team it
> becomes urgent to ensure that the availability of MG per regions
> aligning with the contractual obligations should be made available.
> 
> Therefore, we request the number of generators available with MATECH,
> breakdown per region and cluster is required. This should align with
> the current load on site, 20-30KVA.
> 
> NB: contractually 1MG/100sites
> 
> Feedback awaited,
> 
> Best regards
> 
> Valeur Houell Issey
> 
> Senior Manager, Operations
> 
> IHS Cameroon S.A.
> 
> 1602/1606, Blvd. de La Liberté, Akwa
> 
> P.O. Box 15115, Douala Cameroon
> 
> www.ihstowers.com [1]
> 
> Office:   +237 242738708
> 
> Mobile: +237 677549884
> 
>                +237 655999884
> 
> Email:     valeur.houell@ihstowers.com
> 
> Please consider the environment before printing this e-mail.
> 
> This email and its attachments, may contain confidential and/or
> proprietary information, and could be used only by the person or
> entity to which it is addressed. If the reader of this e-mail is not
> the intended recipient or his or her authorized agent, the reader is
> hereby notified that any disclosure of this e-mail is prohibited. If
> you have received this e-mail in error, please notify the sender and
> delete it from your system.
> 
> 
> 
> Links:
> ------
> [1] http://www.ihstowers.com/
